Contact & request a quote
A short form, then an engineer replies in 24 hours
Engineering review and quotation within 24 hours, from a person who has read your files rather than a sales script. No MOQ, so a single validation piece is a real order.
- [email protected], answered within one working day, GMT+8
What this page answers
The form is the main content here. Everything else on the page removes a reason not to fill it in.
Promised response: engineering review and quotation within 24 hours. If the form does not go through, email [email protected] directly.
Request a quotation
A short form, nothing optional to explain
Name, company, email, country, the service you need, quantity and a message. Country decides the shipping lane and the compliance documents; quantity carries no minimum.
Address and contact
Where the plant actually is
Couriers, samples and auditors all need the same address. It is a single building in Xixiang, Bao'an District, on the 107 National Highway.
Factory and office
4th Floor, Building 13, Rundongsheng Industrial Zone,107 National Highway, Longteng Community,
Xixiang Street, Shenzhen, Guangdong, China
- Quotations and files: [email protected]
- Response promise: engineering review and quotation within 24 hours, on working days
- Working hours: Monday to Saturday, GMT+8; enquiries in English or Chinese are both handled
- Shipping from: Shenzhen, courier under 45 kg, air freight 45-150 kg, sea above 1 CBM
Before you submit
What to send, and the one thing that saves a round trip
Nothing here is mandatory. Sending what you have is faster than waiting until you have everything.
- Gerber data together with the stackup and impedance requirements, layer count, laminate, dielectric thickness and the target impedance per net class.
- BOM with manufacturer part numbers, quantities and the alternates you will accept, so obsolete and long-lead parts are flagged in the same review.
- Pick-and-place data in CPL or CSV, with your rotation convention if it differs from the CAD default.
- Also useful: surface finish and solder-mask colour, the delivery form you want (bare board, assembled, boxed), the target annual volume and whether components will be consigned or sourced by us.
Capability quick check
Six numbers, so you know it fits
The parameters buyers check before they spend time on a form.
After you submit
Four steps, and where the 24 hours falls
The same opening half of the six-step process described in the FAQ, so the two pages cannot disagree about what happens next.
You receive a confirmation
The same working day, from an engineer who has opened your files. Not an autoresponder, and not a request for a call before anyone has read anything.
Engineering and DFM review
Stackup, drill, annular ring, panelisation, impedance targets and the long-lead or end-of-life parts on your BOM are checked against the process window.
Quotation and lead time
Within 24 hours of receipt: price, lead time against both material clocks, terms and delivery form, issued with the DFM notes.
Scheduling
On your written go-ahead the order is scheduled, long-lead material is locked first, and the nine SMT lines and 4-5 DIP lines are booked against the delivery date.
Confidentiality and compliance
Send the files with the NDA already in place
Four commitments that hold before any purchase order exists, and the credentials that sit behind them.
The certificate scans we hold are published on the evidence page, with their numbers and validity dates legible. A signed document pack goes out with every quotation, under NDA, together with the RoHS and REACH material declarations for your board.
Engineering review and quotation within 24 hours
One email, one engineer, 24 hours
No MOQ, no captcha, no second form. Send Gerber, BOM and placement data , or a paragraph describing the project, and the reply carries a quotation and a DFM report.